Industrial & Commercial Experience

COOPER Power Systems/Minera Doña Ines de Collahuasi

Collahuasi Copper Mine Project, Iquique, Chile.

PG&D provided technical inspection, field supervision, testing, commissioning and operational training for the installation of several substation harmonic filter banks with voltages up to 23 kV for Doña Ines De Collahuasi Mine Expansion.

MOTOROLA

Telecommunications Plant, Plantation, Florida.

PG&D has performed numerous comprehensive preventive maintenance and testing activities of the main 23 kV double-ended automatic transfer switchgear, 23 KV feeder circuits, and eight-double ended unit substations at the one million sq-ft R&D facility.

TW TELECOM

IT/Data Center Facility, Ft. Lauderdale, Florida.

PG&D provided design services and construction permit support for the installation of a 600 kW standby power generator and corresponding transfer schemes for a mission critical telecommunications and data center facility.

TELEFONICA USA

Telecommunications Facility, Boca Raton, Florida.

PG&D performed design services for the installation of an emergency transfer bypass distribution system to support the telecommunications infrastructure critical equipment. This project provided dedicated emergency power feeders and switches to critical electrical and mechanical systems.

ALLIED New Technologies

Chemical Plant, Ft. Pierce, Florida.

PG&D provided construction supervision, testing, commissioning and start-up services related to the installation of a 23 kV metal-clad automatic transfer switchgear, harmonic filters and plant wide 23 kV/480 volts power distribution system at a new Sodium Hypochlorite Bleach Plant.

DHL Global

Cargo facility, Miami International Airport, Florida.

PG&D provided electrical design services and construction permit support for the modernization and expansion of DHL’s international logistics cargo facility to include building power distribution, lighting and communication systems.

TOYOTA/JM Enterprises

Building Complex, Deerfield Beach, Florida.

PG&D provided engineering, design, construction permitting and field support for the installation of eight standby power generators ranging in size from 400 to 750 kW and power distribution for a large commercial building complex.

COOPER Power Systems/Codelco

Codelco Gaby Copper Mine, Calama, Chile.

PG&D provided technical inspection, field supervision, testing, commissioning and operational training for the installation of three 46-kV harmonic filters, detuned capacitor banks, and associated switching and controls.

WINN-DIXIE Stores

Food Retail Supermarkets, throughout Florida.

PG&D provided engineering, design, construction permitting and field support for the installation of forty-seven standby power generators ranging in size from 500 to 750 kW to enable large grocery stores to remain fully operational in the event of a natural disaster or power outage.

WHOLE FOODS

Food Retail Supermarkets, South Florida.

PG&D provided engineering, design and construction permitting for the installation of several standby power generators ranging in size from 500 to 1000 kW to enable large grocery stores to remain fully operational in the event of a natural disaster or power outage.

COOPER Power Systems/Bechtel

Los Bronces Copper Mine Project, Santiago, Chile.

PG&D provided technical inspection, field supervision, testing, commissioning and operational training for the installation of several substation harmonic filter banks with voltages up to 45 kV for Los Bronces Mine Expansion.

CAPCANA/Sinercon

Capcana Resort, Punta Cana, Dominican Republic.

PG&D participated in the planning, equipment selection, line routing study and costs estimates for the construction of the main electrical power distribution system at a major hotel and resort complex development involving several 34.5/12.47 kV substations, overhead and underground MV feeders and corresponding 480 volts load centers.

ALLIED NEW TECHNOLOGIES 2 – Chemical Plant

CHEMICAL PLANT, Palmetto, Florida

PG&D provided engineering, detailed design, equipment specifications and field inspections and electrical testing support for the installation of a 23-kV/480 volts unit substation, 480/120 volts plant wide power distribution system, DC chemical process rectifying systems and electric utility interface for a new Allied New Technologies 2 Sodium Hypochlorite-Bleach Chemical Plant.

 

NORTHROP GRUMMAN

Aerospace Systems Plant, El Segundo, California.

Planning, engineering, design and project management for upgrade project of 3.5M sq-ft aircraft manufacturing plant 69 kV substation, in-plant 16.5 kV power distribution system, automatic transfer walk-in switchgear and four 16.5 KV/480 volts unit substations and utility interface.

ALLIED NEW TECHNOLOGIES

Chemical Plant, Fort Pierce, Florida.

PG&D performed engineering, detailed design and electrical permitting support for the installation of a 23 kV double-ended metal-clad automatic-transfer switchgear, 20 MVA substation transformers, plant wide 480 volts power distribution system, 400 volts DC rectifying systems and utility interface for construction of a Sodium Hypochlorite Bleach plant.

TORBURN/MAGIC LEAP

Plantation Pointe R&D Facility, Plantation, Florida.

PG&D provided engineering, detailed design, equipment specifications, project management, field inspections, testing and commissioning support for the replacement of a 23-kV/480 volts 3000 KVA unit substation in support of mission critical Magic Leap R&D facility to include project planning, construction overview, and final cutover.

our drivers

Delivery

Delivering to our customers value through design-build and responsive results.

Experience

Experience plus innovation deliver powerful results.

Innovation

Providing innovative engineering tailored to the specific needs of each of our Clients.

Quality

You outsource for many reasons... accountability, cost, quality. But you select the team that fits the best.